kourygeo.com
Koury Client Showcase
http://www.kourygeo.com/clients.html
FAIL (the browser should render some flash content, not this). Los Angeles Mission College Health and PE Center. Service Dates: 08/2007 Current. Project Description: Construction of a LEED-certified 2-story (90,000 sq. ft.) Health and Physical Education facility - The facility includes a three court gymnasium, an elevated jogging track, multiple classrooms, lockers and fitness areas. West Los Angeles College, Student Services and Classroom Buildings. Service Dates: 05/2008 Current. Project Description: P...
kourygeo.com
Koury Inspection Services
http://www.kourygeo.com/inspection.html
FAIL (the browser should render some flash content, not this). Field Observation and Testing. WHAT DOES A FIELD SOILS TECHNICIAN DO? 1 The soils technician works under supervision of the project’s geotechnical engineer, in coordination with the project inspector, and the site superintendent;. 2 By reviewing approved plans, specifications and soils report, becomes familiar with the project requirements, specially grading plans and details and the recommendations outlined in the soils report;. 10 Reports t...
kourygeo.com
Koury Services
http://www.kourygeo.com/services.html
FAIL (the browser should render some flash content, not this). Geotechnical Field Explorations/ Investigations. Foundation Design and Recommendations. Shallow Foundation System Analysis. Deep Foundation System Analysis. Ground Motion Response Spectra. Liquefaction and Seismic Settlement Analysis. Slope Stability Investigation and Analysis. Seismic Deformation Analysis of Slopes. Lateral Earth Pressure Analysis. Pavement Design and Recommendations. Shrinkage and Subsidence Analysis. Shoring System Install...
kouryengineering.com
Koury FAQ's
http://www.kouryengineering.com/faq.html
FAIL (the browser should render some flash content, not this). FAIL (the browser should render some flash content, not this). FAIL (the browser should render some flash content, not this). 1 Q: What is the primary purpose of a Testing Lab? 2 Q: Why do your proposals contain estimates rather than fixed costs? 3 Q: Why would it be more beneficial for us to hire a firm employing full time. Special/Deputy Inspectors such as yours? 6 Q: What is the difference between continuous and periodic inspection? Accord...
kouryengineering.com
Koury Materials Testing
http://www.kouryengineering.com/testing.html
FAIL (the browser should render some flash content, not this). FAIL (the browser should render some flash content, not this). FAIL (the browser should render some flash content, not this). Koury’s field testing and inspection personnel each hold multiple licenses/certifications. In many cases this allows our personnel to cover multiple disciplines at one time, saving our clients money. Pull Testing (Drilled in Anchors and Ceiling Wires). Grading Recommendations Foundation Design.
kouryengineering.com
Koury Staff
http://www.kouryengineering.com/staff.html
FAIL (the browser should render some flash content, not this). FAIL (the browser should render some flash content, not this). FAIL (the browser should render some flash content, not this). Richard D. Koury, President and C.E.O. Dave Menefee, Senior Vice President and C.O.O. Mr Menefee received the 2003 Distinguished Project Award for Construction Management of Cerritos Library from the Western Council of Construction Consumers (WCCC). Tommy Wright, Vice President of Sales and Marketing.
kouryengineering.com
Koury Special Inspection
http://www.kouryengineering.com/inspection.html
FAIL (the browser should render some flash content, not this). FAIL (the browser should render some flash content, not this). FAIL (the browser should render some flash content, not this). Rebar or Tendon Placement. Block or Brick Sampling. Welding Procedure Specification (WPS) Review. Our NDT division "Integrated Quality Services" is Nadcap accredited, which is the highest standard for NDT services. 2009 site by US Capital, Inc.
kourygeo.com
Koury Staff
http://www.kourygeo.com/staff.html
FAIL (the browser should render some flash content, not this). Richard D. Koury, President and C.E.O. Jacques B. Roy, P.E., G.E. Matin Noorzay, Project Engineer:. Armen Gaprelian, P.E., G.E., Project Engineer. Ray Roblero, Field and Operations Manager. Jasmin Kelley, Project Manage. Michele Shams, Controller. 2009 site by US Capital, Inc.